
The operational capacity behind every CRT plant.
An equipped workshop, work fleet and testing instrumentation: the operational structure that lets us follow a project from workshop machining to on-site installation, in Italy and abroad.

Work fleet — Jungheinrich lift truck

In-house workshop — sheet metal cutting

Site & installation — monorail system
Everything needed to build, transport and install
An integrated structure, designed not to depend on third parties during the critical phases of a project.
Workshop and steel fabrication
In-house department for mechanical work and light, medium and heavy steel fabrication.
Transport and lifting fleet
A dedicated fleet for transporting components and on-site installation, including off-site work.
Field installation teams
Qualified staff for assembly, start-up and technical support at the customer's facility.
Testing instrumentation
Equipment and tools dedicated to functional testing and certification of plants and machinery.
Spare parts and components warehouse
Stock and component management for rapid maintenance and support interventions.
Loading and unloading areas
Internal logistics organized for shipments to sites in Italy and abroad.
Our main equipment
An in-house machine fleet for steel fabrication and mechanical work, without relying on subcontractors during critical phases.
- 3 MEP band saws for steel
- 1 upcut saw for aluminium
- 1 press brake
- 1 sheet metal shear
- 1 100T multi-function profile cutter
- 1 HSW machine for plate punching and notching
- 1 pillar drill
- 1 multi-function drill/mill
- 1 sandblasting system
- 1 press for extraction and press-fitting
Our work fleet
Lifting equipment and elevating platforms for installation work at height and in safety.
- Lugli lift truck, 3-ton capacity
- Toyota lift truck, 3-ton capacity
- Jungheinrich lift truck, 3-ton capacity
- 4 vertical lift platforms
- 12 m articulated boom lift
- 16 m articulated boom lift
Equipment and fleet at work

Manipulator on an assembly line

HSW — plate punching

Electrical switchboard — FCA Pomigliano plant

Industrial manipulator

BHEV battery lifter/transfer unit
3,000 sqm of production, offices and R&D
A facility organized by functional areas, supporting the entire project cycle.
Production areas
1,000 sqm dedicated to steel fabrication, plant and equipment assembly.
Yards and green areas
1,000 sqm of yards, parking and green areas around the facility.
Loading and unloading bay
500 sqm dedicated to vehicle loading and unloading logistics.
Technical offices
200 sqm for mechanical and electrical design and project management.
R&D laboratory
100 sqm for developing and testing solutions before line start-up.
Equipment storage
100 sqm of storage for manual and automatic equipment.
Training room
50 sqm dedicated to technical training for staff and customers.
Paint storage
50 sqm warehouse dedicated to painting materials.
Have an industrial plant or automation project to build?
From design to commissioning, we follow your plant through every phase with the same technical rigor demanded by leading European automotive groups.
